Chapter Selection.

Manufacturing Building

Hankook Tire Manufacturing
Plant Expansion

CLIENT

Hankook Tire

LOCATION

Clarksville, TN

SIZE

2,200,000 SF

The facilities will house the production of Hankook’s passenger car (PCR) and truck/bus (TBR) tire production lines. This large-scale project includes site improvement, utility installation and relocations, paving, deep foundations, concrete foundations/slabs and deep equipment pits, multistory structural steel mixing building, ASRS mat foundations, IMP exterior, CMU-IMP interior walls, TPO roofing, and miscellaneous supporting architectural features.

Systems for the project include special hazard and in-rack fire suppression, domestic plumbing, HVAC, process mechanical distribution piping and equipment (cooling/chilled water, compressed air, steam, etc.), industrial electrical distribution, process controls, and fire alarm systems. Other components of the project include large additions to the existing Phase 1 plant, ancillary buildings to support the main plan, rail spur additions, and main entry canopy upgrades.

ENTERPRISE

Clayco

OFFICE

St. Louis

DISCIPLINE

Architecture
Landscape Architecture
Technical Assurance Group (TAG)

Previous
Previous

CTA Training and Control Center Operations Facility

Next
Next

Kali Hotel