Chapter Selection.
Manufacturing Plant Campus
ENTEK
CLIENT
ENTEK
LOCATION
Terre Haute, IN
SIZE
2,400,000 SF
LJC, in partnership with Clayco, is designing ENTEK’s state-of-the-art manufacturing facility for lithium battery separator production. The facility will support the production needs of 1.4 to 1.6 million electric vehicles annually, helping ENTEK meet growing industry demands. The design features six industrial buildings, each housing flexible production lines that can adapt to future operational changes. With a 1,350-foot linear process line, the layout optimizes efficiency while integrating spaces for public tours and employee support.
The project embraces sustainability, incorporating insulated concrete panels, native prairie landscaping, and renewable energy systems to reduce environmental impact. LJC navigated the challenge of ENTEK’s evolving production needs through multiple iterations of master planning, ensuring the design meets both current and future requirements. This facility not only reinforces ENTEK’s role in advancing battery technology but also supports government initiatives to increase domestic production, creating 500 to 600 jobs in the Terre Haute area.
ENTERPRISE
Clayco
CDE
OFFICE
St. Louis
Chicago
Kansas City
DISCIPLINE
Architecture
Interior Design
Landscape Architecture
Urban Planning & Design
Technical Assurance Group (TAG)
An exterior employee patio provides shade and seating for occupants to enjoy the outdoors. Low maintenance and minimal irrigation plantings were included to promote a natural ecosystem.